AI QA/QC for constructability and coordination review.
What is AI QA/QC for constructability and coordination review?
AI QA/QC for general contractors is a constructability and coordination review that runs from bid through buyout. Specset catches conflicts while the bid is still being priced, and the same record carries into submittals and RFIs. Each drawing finding cites its source and is marked up on the plan sheet.
How do general contractors catch conflicts before buyout?
Constructability and coordination run on the same pass. Specset files conflicts between the specifications and the drawings while the bid is still being priced, with each finding cited and marked up on the plan sheet. That record carries through buyout.
How can AI help at buyout?
The review is connected across the workflow, on one project record. Findings filed while the bid is priced stay cited at buyout, and that record continues into submittal review and RFI response drafting. Your reviewer confirms, downgrades, or rejects each call.
What file comes back when the submittal is reviewed?
The submittal comes back with markup and citations, a cover sheet, annotations, and stamps. Your project engineer still makes the call.
What do general contractors ask about QA/QC?
01Is constructability on the same pass as coordination?
Yes. Constructability is a review lens for whether the design can be built, on the same pass as coordination. Findings cite the section and the sheet.
02What does before buyout mean on this review?
The first pass runs while the bid is still being priced. Conflicts are filed, cited, and marked up on the plan sheet before buyout, and the same record is still open at buyout.
03How can AI help at buyout?
The review stays on one project record from bid through buyout. Findings filed while the bid is priced are still cited, and that record continues into submittals and RFIs.
04Can Specset draft a proposed RFI response from the specs and drawings?
Yes. Specset drafts proposed RFI responses from the conformed spec book and drawings, citing the governing section, for the design team to edit and approve, with Procore or Autodesk Forma Build as the RFI log.
05What does a reviewed submittal include?
Markup and citations, a cover sheet, annotations, and stamps. The project engineer confirms the disposition.
06Does the general contractor still make the call?
Yes. Specset files the finding. Confirm, downgrade, or reject stays with your reviewer, on the design review and on the submittal.
What do you send for a QA/QC review?
One design set: the specifications and the drawings. The findings come back with their sources, and you check the sheets.