Skip to content
Specset Facilities & Maintenance · For the owners who operate

The as-built record, answerable.

After delivery, the specs, drawings, submittals, and O&M manuals stay ingested and answerable, for the life of the asset.

Generator floor, Grand Coulee Dam · Photo: Library of Congress
01 · Handover

The record arrives built.

Most buildings lose their memory at turnover. On Specset the specs, drawings, submittals, and O&M manuals stay ingested and cross-referenced into the assets, warranties, and maintenance plans the building runs on, every fact cited to the page it came from.

Closeout today

Banker's boxes and a thousand-page PDF.

Nobody can search it, so nobody does. The answers live in one veteran tech's head, and the record dies the day the building is handed over. The maintenance system, if there is one, gets typed in from memory.

On Specset

One ingested record.

Every spec section, sheet, submittal, and O&M manual read once, then held as the assets, warranties, procedures, and plans your team runs the building from. Nothing is re-keyed, and every line points back to its source.

Built, not typed

The asset registry, the warranties, and the maintenance plans are read out of the closeout documents and the O&M manuals. Nobody keys them in.

Cited to the paragraph

Every procedure step, warranty term, and answer carries the section it came from. Click it and the page opens.

Generated, not templated

Plans follow what the manual requires, on a calendar or a meter. Work orders materialize 90 days ahead and are reconciled every night.

One record, bid to work order

Projects built on Specset hand over without a migration: the closeout record simply becomes the operations record.

The asset record

Every installed product, with its manual attached.

Tagged and serial-tracked by system and location, from site down to room. Each asset carries the product actually installed, the submittal and the sheet it appears on, its warranty, and a maintenance schedule read straight out of the O&M manual, line by line, each line cited.

Site → roomeight location levels
Sheet + submittallinked on every asset
Citedevery maintenance line
How the record is built at closeout →
Fig. 01 · The asset record, with the maintenance the manual asks for and the paragraph that asks for it
Built on Specset

The record already exists.

Projects that closed out on Specset carry over the day they finish. Same assets, same warranties, same documents; the closeout record becomes the operations record, at the preferred rate.

  1. ✓AssetsThe closeout registry, tags, products, and locations intact
  2. ✓WarrantiesTerms, dates, and contacts, already extracted
  3. ✓DocumentsSubmittals, sheets, and O&M manuals, still linked
  4. ✓PlansThe procedures the manuals require, ready to schedule
See closeout on Specset →
Running an older building

We rebuild the record from what you have.

Send the O&M binders, the master compilations, the vendor PDFs, decades old included. An import agent works the package in four passes and returns a facility, not a folder.

  1. 01HierarchyLocations, systems, and the asset registry from the index
  2. 02ScanProducts and assets from each document, with its role
  3. 03ExtractionWarranties, procedures, and plans, cited
  4. 04DocumentationA written record per asset and system
Talk through a building →
02 · Operate

The record generates the work.

Not an archive. It knows what is due, what is late, which warranty lapses next, and what the manual says to do about each one. And it answers the questions your team asks from the floor.

Fig. 02 · The day, generated: what is due, what is late, and what the weather flags
The day

Nothing waits for someone to remember.

Every night the plans are reconciled and the next ninety days of work orders materialize. The board opens on what is due, what is late and by how long, which warranties lapse inside ninety days, and which outdoor work the forecast flags. Assign in bulk, or let the tech pick up the day.

Nightlyplans reconciled, drift retired
90 daysof work materialized ahead
One boardoverdue · today · week · warranties
The work order

The checklist is the procedure.

Each work order runs as a guided checklist, on a phone in the mechanical room or a laptop in the office, and resumes on any device where it stopped. Every step carries the O&M section it came from. Photo steps take the photo as the answer; a flagged step drafts the corrective for you to confirm; finishing the order draws the parts it used from spares and flags anything that fell below minimum.

10field types, checkbox to photo to parts
Any devicea run resumes where it stopped
Citedevery step to its O&M section
Fig. 03 · A guided run. Steps cite the manual, the flag drafts the corrective, and completion moves the parts.
Ask the building

Unlimited Q&A for your facilities team.

Every answer cites the O&M section it came from and links to the asset record: the as-installed product, its location, warranty status, and the next maintenance date.

Fig. 04 · A question from the floor, answered from the record the building was built from
03 · Plan

The year, drawn and priced.

Every plan on one timeline with the warranties beside it, and every procedure costed from trade rates and parts, so the fiscal year is a forecast instead of a guess.

Fig. 05 · The year on one timeline: warranties as bars, maintenance as markers, and the projections the plans imply
Calendar, meter, or as needed

A plan fires on an interval, on a reading, or only when called, whichever the manual specifies. Fixed or floating cadence, your choice.

Warranties beside the work

Start dates, terms, and contacts extracted from the closeout documents; coverage ending within ninety days surfaces on the dashboard by itself.

Spares that count themselves

Planned parts reserve stock; completion draws it down. Below minimum flags a reorder, critical parts email the escalation contact, and the export lists what to buy first.

The budget

The year, priced in advance.

Every procedure is costed from your trade rates, the parts it plans to use, and any contracted service. The fiscal year rolls up by month with a corrective reserve, and cuts by system, asset, trade, or category, so the budget request is a report, not a spreadsheet weekend. Federal fiscal years are a setting.

12 monthslabor · parts · services · reserve
4 cutssystem · asset · trade · category
Oct 1federal fiscal year supported
Fig. 06 · The fiscal year as a forecast: every procedure costed, every month stacked, every system cut
In production

Running day to day for a federal science agency, from questions on the record to the maintenance calendar and the fiscal-year forecast.

Same record as construction

The operations record is the closeout record, so nothing is re-keyed at handover and every answer still cites its source.

Flat annual rate

Priced per facility with unlimited users. No seats to count, no usage to meter.

FedRAMP 20x · in progressSOC 2 Type IISpecGov CUI enclave
Security & compliance →
Start where you are

Start with one building.

Bring the turnover package from a recent project, or the binder shelf from an old one. We'll show you the record it becomes.